Description
1.Preparation for lifting with container loader: The lifting strap is 4 meters at the small platform and 6 meters at the large platform; the lifting points need to be installed when lifting on both sides of the large platform, and need to be removed after loading and unloading.
Steps for loading Container Loader
The picture shows the hook placed in the vehicle accessories, and the loading and unloading lifting points are as follows.
Steps for loading Container Loader
2.Platform installation: 4 people are required to lift the workbench and place it on the forklift. Note that the forklift should enter after the workbench is lifted to avoid hitting the cylinder. Move the forklift after the workbench is stable, lower the workbench to the corresponding platform installation hole, and tighten the 8 screws.
Steps for loading Container Loader
After the workbench screws are tightened, the wiring harness and plug-ins at the bottom are reset according to color.
Steps for loading Container Loader
Mobile board installation: The picture shows the departure status.
Steps for loading Container Loader
The large and small platform installation:
Steps for loading Container Loader
Ladder installation:
Steps for loading Container Loader
Note: When loading, follow the above process in reverse to disassemble, and the lifting points on both sides of the large platform must be installed face to face.
Jiangsu Tianyi Aviation Industry Co., Ltd.
Factory: No.2 Hang Kong Road High-tech zone, Jianhu county, Yancheng City, Jiangsu Province, P.R.China
Shanghai Office: Floor 6th, Bld 36, No.1218 Huateng Road, Qingpu District Shanghai, P.R.China
Tel: +86 21 5049 6088 / +86 400 9980 919
Mobile: +86 137 6133 5725 (As WeChat)
+86 189 6407 9542
E_ mail: malie@jstianyi.com.cn
joinsun@jstianyi.com.cn
airport.gse@jstianyi.com.cn
Website: www.tianyi-gse.com